Cincinnati VA Medical Center

The Cincinnati VA needed several Chilled Water flow meters calibrated and to assist the facility better meter steam needs, they needed two new Inline Variable Area Steam Flow Meters installed. They also needed a means of metering incoming high pressure steam and transmitting the flow back to their ECC for remote monitoring and trending.

During this project B2 Constructors procured and installed the new Steam Meters and associated controls, performed the integration of the new components into their ECC and BAS systems and calibrated the existing flow meters. Multiple steam outages were scheduled to install the meters during the heating season.