Pages
Posts
Projects
- Install Building 13 Fire Sprinkler System
- Upgrade Energy Management System Infrastructure
- Tuck Point & Caulk Various Buildings
- Provide Emergency Air Handler for the ER Department
- Replace the Operating Room Chiller & Building 204 Catheter Lab Chiller
- Rehab Campus Surfaces
- Water Main Replacement
- Replace Water Loop
- Install Security Features
- Replace the Main Water Loop
- Rental of 400 HP Fire Tube Boiler Plant
- Improve Irrigation System and Water Service
- Section 1KK Crypt Conversion
- Replace Irrigation System and Improve Roads
- Chiller Preventative Maintenance
- Design-Build Replace Failing Deaerator Tank and Controls
- Provide Chiller Maintenance and Service
- Upgrade 6 South Steam Reheat
- Install ADA Upgrades
- Replace Cooling Towers
- Replace Fiber Optic Between the Administration/Maintenance Complex and the Public Information Center Buildings
- Replace Deaerator
- Upgrade to Egress Doors on Second Story ER Suite
- Install New Utility Meters and Flowmeters
- Perform ADA Upgrades